General Information |
|
Study Number: | TPF-5(081) |
Former Study Number: | SPR-3(075) |
Lead Organization: | Iowa Department of Transportation |
Contract Start Date: | Jan 01, 2004 |
Solicitation Number: | 766 |
Partners: | FHWA, IADOT, KS, MO, NE, WI |
Contractor(s): | University of Kansas,University of Nebraska - Lincoln,Meyer ITS,University of Wisconsin-Milwaukee,Iowa State University |
Status: | Closed |
Est. Completion Date: | May 31, 2015 |
Contract/Other Number: | |
Last Updated: | Aug 29, 2017 |
Contract End Date: | Dec 31, 2014 |
Financial Summary |
|
Contract Amount: | $245,000.00 |
Total Commitments Received: | $1,917,500.00 |
100% SP&R Approval: | Approved |
Contact Information |
|||
Lead Study Contact(s): | Brian Worrel | ||
brian.worrel@iowadot.us | |||
Phone: 515-239-1471 | |||
FHWA Technical Liaison(s): | Kenneth Opiela | ||
Kenneth.Opiela@fhwa.dot.gov | |||
Phone: 202-493-3317 | |||
Study Champion(s): | Tammy Bailey | ||
Tammy.Bailey@dot.iowa.gov |
Organization | Year | Commitments | Technical Contact Name | Funding Contact Name | Contact Number | Email Address |
---|---|---|---|---|---|---|
Federal Highway Administration | 2003 | $20,000.00 | Tracy Scriba | Pidge Chapman | 202-366-8889 | pidge.chapman@dot.gov |
Iowa Department of Transportation | 2004 | $10,000.00 | Dan Sprengeler | Cheryl Cowie | 515-239-1447 | Cheryl.Cowie@iowadot.us |
Iowa Department of Transportation | 2005 | $45,000.00 | Dan Sprengeler | Cheryl Cowie | 515-239-1447 | Cheryl.Cowie@iowadot.us |
Iowa Department of Transportation | 2006 | $45,000.00 | Dan Sprengeler | Cheryl Cowie | 515-239-1447 | Cheryl.Cowie@iowadot.us |
Iowa Department of Transportation | 2007 | $22,500.00 | Dan Sprengeler | Cheryl Cowie | 515-239-1447 | Cheryl.Cowie@iowadot.us |
Iowa Department of Transportation | 2008 | $25,000.00 | Dan Sprengeler | Cheryl Cowie | 515-239-1447 | Cheryl.Cowie@iowadot.us |
Iowa Department of Transportation | 2009 | $30,000.00 | Dan Sprengeler | Cheryl Cowie | 515-239-1447 | Cheryl.Cowie@iowadot.us |
Iowa Department of Transportation | 2010 | $30,000.00 | Dan Sprengeler | Cheryl Cowie | 515-239-1447 | Cheryl.Cowie@iowadot.us |
Iowa Department of Transportation | 2011 | $45,000.00 | Dan Sprengeler | Cheryl Cowie | 515-239-1447 | Cheryl.Cowie@iowadot.us |
Iowa Department of Transportation | 2012 | $45,000.00 | Dan Sprengeler | Cheryl Cowie | 515-239-1447 | Cheryl.Cowie@iowadot.us |
Iowa Department of Transportation | 2013 | $45,000.00 | Dan Sprengeler | Cheryl Cowie | 515-239-1447 | Cheryl.Cowie@iowadot.us |
Iowa Department of Transportation | 2014 | $0.00 | Dan Sprengeler | Cheryl Cowie | 515-239-1447 | Cheryl.Cowie@iowadot.us |
Kansas Department of Transportation | 2003 | $25,000.00 | Kristina Ericksen | Susan Barker | 785-291-3847 | susan.barker@ks.gov |
Kansas Department of Transportation | 2004 | $80,000.00 | Kristina Ericksen | Susan Barker | 785-291-3847 | susan.barker@ks.gov |
Kansas Department of Transportation | 2005 | $80,000.00 | Kristina Ericksen | Susan Barker | 785-291-3847 | susan.barker@ks.gov |
Kansas Department of Transportation | 2006 | $80,000.00 | Kristina Ericksen | Susan Barker | 785-291-3847 | susan.barker@ks.gov |
Kansas Department of Transportation | 2007 | $50,000.00 | Kristina Ericksen | Susan Barker | 785-291-3847 | susan.barker@ks.gov |
Kansas Department of Transportation | 2008 | $50,000.00 | Kristina Ericksen | Susan Barker | 785-291-3847 | susan.barker@ks.gov |
Kansas Department of Transportation | 2009 | $50,000.00 | Kristina Ericksen | Susan Barker | 785-291-3847 | susan.barker@ks.gov |
Kansas Department of Transportation | 2010 | $50,000.00 | Kristina Ericksen | Susan Barker | 785-291-3847 | susan.barker@ks.gov |
Kansas Department of Transportation | 2011 | $50,000.00 | Kristina Ericksen | Susan Barker | 785-291-3847 | susan.barker@ks.gov |
Kansas Department of Transportation | 2012 | $50,000.00 | Kristina Ericksen | Susan Barker | 785-291-3847 | susan.barker@ks.gov |
Kansas Department of Transportation | 2013 | $50,000.00 | Kristina Ericksen | Susan Barker | 785-291-3847 | susan.barker@ks.gov |
Kansas Department of Transportation | 2014 | $0.00 | Kristina Ericksen | Susan Barker | 785-291-3847 | susan.barker@ks.gov |
Kansas Department of Transportation | 2015 | $0.00 | Kristina Ericksen | Susan Barker | 785-291-3847 | susan.barker@ks.gov |
Missouri Department of Transportation | 2004 | $15,000.00 | Dan Smith | Bill Stone | 573-526-4328 | william.stone@modot.mo.gov |
Missouri Department of Transportation | 2006 | $50,000.00 | Dan Smith | Bill Stone | 573-526-4328 | william.stone@modot.mo.gov |
Missouri Department of Transportation | 2007 | $30,000.00 | Dan Smith | Bill Stone | 573-526-4328 | william.stone@modot.mo.gov |
Missouri Department of Transportation | 2008 | $50,000.00 | Dan Smith | Bill Stone | 573-526-4328 | william.stone@modot.mo.gov |
Missouri Department of Transportation | 2009 | $50,000.00 | Dan Smith | Bill Stone | 573-526-4328 | william.stone@modot.mo.gov |
Missouri Department of Transportation | 2010 | $50,000.00 | Dan Smith | Bill Stone | 573-526-4328 | william.stone@modot.mo.gov |
Missouri Department of Transportation | 2011 | $50,000.00 | Dan Smith | Bill Stone | 573-526-4328 | william.stone@modot.mo.gov |
Missouri Department of Transportation | 2012 | $50,000.00 | Dan Smith | Bill Stone | 573-526-4328 | william.stone@modot.mo.gov |
Missouri Department of Transportation | 2013 | $50,000.00 | Dan Smith | Bill Stone | 573-526-4328 | william.stone@modot.mo.gov |
Missouri Department of Transportation | 2014 | $0.00 | Dan Smith | Bill Stone | 573-526-4328 | william.stone@modot.mo.gov |
Nebraska Department of Roads | 2004 | $25,000.00 | Dan Waddle | Jodi Gibson | 402-479-4337 | jodi.gibson@nebraska.gov |
Nebraska Department of Roads | 2008 | $10,000.00 | Dan Waddle | Jodi Gibson | 402-479-4337 | jodi.gibson@nebraska.gov |
Nebraska Department of Roads | 2009 | $10,000.00 | Dan Waddle | Jodi Gibson | 402-479-4337 | jodi.gibson@nebraska.gov |
Nebraska Department of Roads | 2010 | $10,000.00 | Dan Waddle | Jodi Gibson | 402-479-4337 | jodi.gibson@nebraska.gov |
Nebraska Department of Roads | 2011 | $10,000.00 | Dan Waddle | Jodi Gibson | 402-479-4337 | jodi.gibson@nebraska.gov |
Nebraska Department of Roads | 2012 | $10,000.00 | Dan Waddle | Jodi Gibson | 402-479-4337 | jodi.gibson@nebraska.gov |
Nebraska Department of Roads | 2013 | $30,000.00 | Dan Waddle | Jodi Gibson | 402-479-4337 | jodi.gibson@nebraska.gov |
Nebraska Department of Roads | 2014 | $0.00 | Dan Waddle | Jodi Gibson | 402-479-4337 | jodi.gibson@nebraska.gov |
Wisconsin Department of Transportation | 2004 | $70,000.00 | Travis Feltes | Lynn Hanus | 608-267-2294 | lynnm.hanus@dot.wi.gov |
Wisconsin Department of Transportation | 2005 | $50,000.00 | Travis Feltes | Lynn Hanus | 608-267-2294 | lynnm.hanus@dot.wi.gov |
Wisconsin Department of Transportation | 2006 | $40,000.00 | Travis Feltes | Lynn Hanus | 608-267-2294 | lynnm.hanus@dot.wi.gov |
Wisconsin Department of Transportation | 2007 | $40,000.00 | Travis Feltes | Lynn Hanus | 608-267-2294 | lynnm.hanus@dot.wi.gov |
Wisconsin Department of Transportation | 2008 | $40,000.00 | Travis Feltes | Lynn Hanus | 608-267-2294 | lynnm.hanus@dot.wi.gov |
Wisconsin Department of Transportation | 2009 | $40,000.00 | Travis Feltes | Lynn Hanus | 608-267-2294 | lynnm.hanus@dot.wi.gov |
Wisconsin Department of Transportation | 2010 | $40,000.00 | Travis Feltes | Lynn Hanus | 608-267-2294 | lynnm.hanus@dot.wi.gov |
Wisconsin Department of Transportation | 2011 | $40,000.00 | Travis Feltes | Lynn Hanus | 608-267-2294 | lynnm.hanus@dot.wi.gov |
Wisconsin Department of Transportation | 2012 | $40,000.00 | Travis Feltes | Lynn Hanus | 608-267-2294 | lynnm.hanus@dot.wi.gov |
Wisconsin Department of Transportation | 2013 | $40,000.00 | Travis Feltes | Lynn Hanus | 608-267-2294 | lynnm.hanus@dot.wi.gov |
Background: This project is a continuation of the work done under project SPR-3(075) which began in 1999 with Nebraska as the lead agency. Nebraska was the lead agency from FY 1999 through 2003. Kansas was the lead agency for FY 2004. Since FY 2005, Iowa has been the lead agency. Full text copies of all individual project reports completed during the life of both projects are available on the project web site, linked below in the field URL of Active Study.
To test and evaluate new technologies for improving safety and traffic flow through work zones.
Test and evaluate new technologies for improving safety and traffic flow through work zones as determined by the TAC. An annual program will be determined by the TAC members with voting privledges. The minimum committment is $25,000 per year for voting privileges. $5,000 or greater hard money contribution qualifies for sponsored TAC member travel. The past committment amounts have been $70-80,000 per year. In-kind contributions are permitted if the associated projects are part of the research program approved by the TAC. A state may participate with any amount and be an ex-officio member. The duration of the study will be extended on an annual basis if interest and funding is provided. 2014: THIS PROGRAM IS BEING CONTINUED UNDER TPF-5(295) UNDER THE SAME NAME. Contracts under TPF-5(081) are being wrapped-up with the last contract closing in late winter/early spring 2015. THE IOWA DOT PROPOSES TO RECONCILE THIS PROJECT IN THE EARLY SUMMER OF 2015.
Subjects: Highway Operations, Capacity, and Traffic Control
No document attached.
General Information |
|
Study Number: | TPF-5(081) |
Lead Organization: | Iowa Department of Transportation |
Contract Start Date: | Jan 01, 2004 |
Solicitation Number: | 766 |
Partners: | FHWA, IADOT, KS, MO, NE, WI |
Contractor(s): | University of Kansas,University of Nebraska - Lincoln,Meyer ITS,University of Wisconsin-Milwaukee,Iowa State University |
Status: | Closed |
Est. Completion Date: | May 31, 2015 |
Contract/Other Number: | |
Last Updated: | Aug 29, 2017 |
Contract End Date: | Dec 31, 2014 |
Financial Summary |
|
Contract Amount: | $245,000.00 |
Total Commitments Received: | $1,917,500.00 |
100% SP&R Approval: |
Contact Information |
|||
Lead Study Contact(s): | Brian Worrel | ||
brian.worrel@iowadot.us | |||
Phone: 515-239-1471 | |||
FHWA Technical Liaison(s): | Kenneth Opiela | ||
Kenneth.Opiela@fhwa.dot.gov | |||
Phone: 202-493-3317 |
Organization | Year | Commitments | Technical Contact Name | Funding Contact Name | Contact Number | Email Address |
---|---|---|---|---|---|---|
Federal Highway Administration | 2003 | $20,000.00 | Tracy Scriba | Pidge Chapman | 202-366-8889 | pidge.chapman@dot.gov |
Iowa Department of Transportation | 2004 | $10,000.00 | Dan Sprengeler | Cheryl Cowie | 515-239-1447 | Cheryl.Cowie@iowadot.us |
Iowa Department of Transportation | 2005 | $45,000.00 | Dan Sprengeler | Cheryl Cowie | 515-239-1447 | Cheryl.Cowie@iowadot.us |
Iowa Department of Transportation | 2006 | $45,000.00 | Dan Sprengeler | Cheryl Cowie | 515-239-1447 | Cheryl.Cowie@iowadot.us |
Iowa Department of Transportation | 2007 | $22,500.00 | Dan Sprengeler | Cheryl Cowie | 515-239-1447 | Cheryl.Cowie@iowadot.us |
Iowa Department of Transportation | 2008 | $25,000.00 | Dan Sprengeler | Cheryl Cowie | 515-239-1447 | Cheryl.Cowie@iowadot.us |
Iowa Department of Transportation | 2009 | $30,000.00 | Dan Sprengeler | Cheryl Cowie | 515-239-1447 | Cheryl.Cowie@iowadot.us |
Iowa Department of Transportation | 2010 | $30,000.00 | Dan Sprengeler | Cheryl Cowie | 515-239-1447 | Cheryl.Cowie@iowadot.us |
Iowa Department of Transportation | 2011 | $45,000.00 | Dan Sprengeler | Cheryl Cowie | 515-239-1447 | Cheryl.Cowie@iowadot.us |
Iowa Department of Transportation | 2012 | $45,000.00 | Dan Sprengeler | Cheryl Cowie | 515-239-1447 | Cheryl.Cowie@iowadot.us |
Iowa Department of Transportation | 2013 | $45,000.00 | Dan Sprengeler | Cheryl Cowie | 515-239-1447 | Cheryl.Cowie@iowadot.us |
Iowa Department of Transportation | 2014 | $0.00 | Dan Sprengeler | Cheryl Cowie | 515-239-1447 | Cheryl.Cowie@iowadot.us |
Kansas Department of Transportation | 2003 | $25,000.00 | Kristina Ericksen | Susan Barker | 785-291-3847 | susan.barker@ks.gov |
Kansas Department of Transportation | 2004 | $80,000.00 | Kristina Ericksen | Susan Barker | 785-291-3847 | susan.barker@ks.gov |
Kansas Department of Transportation | 2005 | $80,000.00 | Kristina Ericksen | Susan Barker | 785-291-3847 | susan.barker@ks.gov |
Kansas Department of Transportation | 2006 | $80,000.00 | Kristina Ericksen | Susan Barker | 785-291-3847 | susan.barker@ks.gov |
Kansas Department of Transportation | 2007 | $50,000.00 | Kristina Ericksen | Susan Barker | 785-291-3847 | susan.barker@ks.gov |
Kansas Department of Transportation | 2008 | $50,000.00 | Kristina Ericksen | Susan Barker | 785-291-3847 | susan.barker@ks.gov |
Kansas Department of Transportation | 2009 | $50,000.00 | Kristina Ericksen | Susan Barker | 785-291-3847 | susan.barker@ks.gov |
Kansas Department of Transportation | 2010 | $50,000.00 | Kristina Ericksen | Susan Barker | 785-291-3847 | susan.barker@ks.gov |
Kansas Department of Transportation | 2011 | $50,000.00 | Kristina Ericksen | Susan Barker | 785-291-3847 | susan.barker@ks.gov |
Kansas Department of Transportation | 2012 | $50,000.00 | Kristina Ericksen | Susan Barker | 785-291-3847 | susan.barker@ks.gov |
Kansas Department of Transportation | 2013 | $50,000.00 | Kristina Ericksen | Susan Barker | 785-291-3847 | susan.barker@ks.gov |
Kansas Department of Transportation | 2014 | $0.00 | Kristina Ericksen | Susan Barker | 785-291-3847 | susan.barker@ks.gov |
Kansas Department of Transportation | 2015 | $0.00 | Kristina Ericksen | Susan Barker | 785-291-3847 | susan.barker@ks.gov |
Missouri Department of Transportation | 2004 | $15,000.00 | Dan Smith | Bill Stone | 573-526-4328 | william.stone@modot.mo.gov |
Missouri Department of Transportation | 2006 | $50,000.00 | Dan Smith | Bill Stone | 573-526-4328 | william.stone@modot.mo.gov |
Missouri Department of Transportation | 2007 | $30,000.00 | Dan Smith | Bill Stone | 573-526-4328 | william.stone@modot.mo.gov |
Missouri Department of Transportation | 2008 | $50,000.00 | Dan Smith | Bill Stone | 573-526-4328 | william.stone@modot.mo.gov |
Missouri Department of Transportation | 2009 | $50,000.00 | Dan Smith | Bill Stone | 573-526-4328 | william.stone@modot.mo.gov |
Missouri Department of Transportation | 2010 | $50,000.00 | Dan Smith | Bill Stone | 573-526-4328 | william.stone@modot.mo.gov |
Missouri Department of Transportation | 2011 | $50,000.00 | Dan Smith | Bill Stone | 573-526-4328 | william.stone@modot.mo.gov |
Missouri Department of Transportation | 2012 | $50,000.00 | Dan Smith | Bill Stone | 573-526-4328 | william.stone@modot.mo.gov |
Missouri Department of Transportation | 2013 | $50,000.00 | Dan Smith | Bill Stone | 573-526-4328 | william.stone@modot.mo.gov |
Missouri Department of Transportation | 2014 | $0.00 | Dan Smith | Bill Stone | 573-526-4328 | william.stone@modot.mo.gov |
Nebraska Department of Roads | 2004 | $25,000.00 | Dan Waddle | Jodi Gibson | 402-479-4337 | jodi.gibson@nebraska.gov |
Nebraska Department of Roads | 2008 | $10,000.00 | Dan Waddle | Jodi Gibson | 402-479-4337 | jodi.gibson@nebraska.gov |
Nebraska Department of Roads | 2009 | $10,000.00 | Dan Waddle | Jodi Gibson | 402-479-4337 | jodi.gibson@nebraska.gov |
Nebraska Department of Roads | 2010 | $10,000.00 | Dan Waddle | Jodi Gibson | 402-479-4337 | jodi.gibson@nebraska.gov |
Nebraska Department of Roads | 2011 | $10,000.00 | Dan Waddle | Jodi Gibson | 402-479-4337 | jodi.gibson@nebraska.gov |
Nebraska Department of Roads | 2012 | $10,000.00 | Dan Waddle | Jodi Gibson | 402-479-4337 | jodi.gibson@nebraska.gov |
Nebraska Department of Roads | 2013 | $30,000.00 | Dan Waddle | Jodi Gibson | 402-479-4337 | jodi.gibson@nebraska.gov |
Nebraska Department of Roads | 2014 | $0.00 | Dan Waddle | Jodi Gibson | 402-479-4337 | jodi.gibson@nebraska.gov |
Wisconsin Department of Transportation | 2004 | $70,000.00 | Travis Feltes | Lynn Hanus | 608-267-2294 | lynnm.hanus@dot.wi.gov |
Wisconsin Department of Transportation | 2005 | $50,000.00 | Travis Feltes | Lynn Hanus | 608-267-2294 | lynnm.hanus@dot.wi.gov |
Wisconsin Department of Transportation | 2006 | $40,000.00 | Travis Feltes | Lynn Hanus | 608-267-2294 | lynnm.hanus@dot.wi.gov |
Wisconsin Department of Transportation | 2007 | $40,000.00 | Travis Feltes | Lynn Hanus | 608-267-2294 | lynnm.hanus@dot.wi.gov |
Wisconsin Department of Transportation | 2008 | $40,000.00 | Travis Feltes | Lynn Hanus | 608-267-2294 | lynnm.hanus@dot.wi.gov |
Wisconsin Department of Transportation | 2009 | $40,000.00 | Travis Feltes | Lynn Hanus | 608-267-2294 | lynnm.hanus@dot.wi.gov |
Wisconsin Department of Transportation | 2010 | $40,000.00 | Travis Feltes | Lynn Hanus | 608-267-2294 | lynnm.hanus@dot.wi.gov |
Wisconsin Department of Transportation | 2011 | $40,000.00 | Travis Feltes | Lynn Hanus | 608-267-2294 | lynnm.hanus@dot.wi.gov |
Wisconsin Department of Transportation | 2012 | $40,000.00 | Travis Feltes | Lynn Hanus | 608-267-2294 | lynnm.hanus@dot.wi.gov |
Wisconsin Department of Transportation | 2013 | $40,000.00 | Travis Feltes | Lynn Hanus | 608-267-2294 | lynnm.hanus@dot.wi.gov |
Background: This project is a continuation of the work done under project SPR-3(075) which began in 1999 with Nebraska as the lead agency. Nebraska was the lead agency from FY 1999 through 2003. Kansas was the lead agency for FY 2004. Since FY 2005, Iowa has been the lead agency. Full text copies of all individual project reports completed during the life of both projects are available on the project web site, linked below in the field URL of Active Study.
To test and evaluate new technologies for improving safety and traffic flow through work zones.
Test and evaluate new technologies for improving safety and traffic flow through work zones as determined by the TAC. An annual program will be determined by the TAC members with voting privledges. The minimum committment is $25,000 per year for voting privileges. $5,000 or greater hard money contribution qualifies for sponsored TAC member travel. The past committment amounts have been $70-80,000 per year. In-kind contributions are permitted if the associated projects are part of the research program approved by the TAC. A state may participate with any amount and be an ex-officio member. The duration of the study will be extended on an annual basis if interest and funding is provided. 2014: THIS PROGRAM IS BEING CONTINUED UNDER TPF-5(295) UNDER THE SAME NAME. Contracts under TPF-5(081) are being wrapped-up with the last contract closing in late winter/early spring 2015. THE IOWA DOT PROPOSES TO RECONCILE THIS PROJECT IN THE EARLY SUMMER OF 2015.
Subjects: Highway Operations, Capacity, and Traffic Control
Title | File/Link | Type | Private |
---|---|---|---|
Acceptance Memo | 2012 TPF-5(081) SWZDI acceptance memo.pdf | Memorandum | Public |
TPF-5(081) Closeout Letter | TPF-5(081) Closeout Letter - Signed.pdf | Memorandum | Public |
TPF-5(081) Closeout Funding Spreadsheet | TPF-5(081) Closoeut Funding Spreadsheet.pdf | Other | Public |
Quarterly Report for the period ending 6/30/04 | qtrly_rpt_06-30-04.pdf | Quarterly Progress Report | Public |
Quarterly Report for the period ending 9/30/04 | qtrly_rpt_09-30-04.pdf | Quarterly Progress Report | Public |
Quarterly Report for the period ending 12/31/04 | qtrly_rpt_12-31-04.pdf | Quarterly Progress Report | Public |
Quarterly Report for the period ending 3/31/05 | qtrly_rpt_03-31-05.pdf | Quarterly Progress Report | Public |
Quarterly Report for the period ending 6/30/05 | qtrly_rpt_06-30-05.pdf | Quarterly Progress Report | Public |
Quarterly Report for the period ending 12/31/05 | qtrly_rpt_12-31-05.pdf | Quarterly Progress Report | Public |
Quarterly Report for the period ending 12/31/06 | qtrly_rpt_12-31-06.pdf | Quarterly Progress Report | Public |
Quarterly Report for the period ending 3/31/08 | qtrly_rpt_03-31-08.pdf | Quarterly Progress Report | Public |
Quarterly Report for the period ending 6/30/08 | qtrly_rpt_06-30-08.pdf | Quarterly Progress Report | Public |
Quarterly Report for the period ending 12/31/08 | qtrly_rpt_12-31-08.pdf | Quarterly Progress Report | Public |
Quarterly Report for the period ending 3/31/09 | qtrly_rpt_03-31-09.pdf | Quarterly Progress Report | Public |
Quarterly Report for the period ending 6/30/09 | qtrly_rpt_06-30-09.pdf | Quarterly Progress Report | Public |
Quarterly Report for the period ending 12/31/09 | qtrly_rpt_12-31-09.pdf | Quarterly Progress Report | Public |
Quarterly Report for the period ending 3/31/10 | SWZDI_3-31-10_rep.pdf | Quarterly Progress Report | Public |
Quarterly Report for the period ending 6/30/2010 | swzdu 6-30-10 qtr rep.pdf | Quarterly Progress Report | Public |
Quarterly Report for the period ending 3/31/2011 | qtrly_rpt_03-31-11.pdf | Quarterly Progress Report | Public |
Quarterly Report for the period ending 6/30/2011 | qtrly_rpt_06-30-11.pdf | Quarterly Progress Report | Public |
Quarterly Report: July-September 2011 | TPF5081_Jul-Sept_2011.docx | Quarterly Progress Report | Public |
Quarterly Report: Oct - Dec 2011 | 5(081) Dec2011 Quartly Rpt.docx | Quarterly Progress Report | Public |
Quarterly Report: March 2012 | 5(081)_FY12 qtr3.pdf | Quarterly Progress Report | Public |
Quarterly Report: June 2012 | June 2012 QPR_5(081).pdf | Quarterly Progress Report | Public |
Quarterly Report: Sept 2012 | TPF-5(081)_Sept 2012.pdf | Quarterly Progress Report | Public |
Quarterly Report: December 2012 | 5(081) Dec 2012 QR.pdf | Quarterly Progress Report | Public |
Quarterly Report: April 2013 | 5(081)QRMarch 2013.pdf | Quarterly Progress Report | Public |
Quarterly Report: June 2013 | TPF-5(081) 2013 Q2.pdf | Quarterly Progress Report | Public |
Quarterly Report: September 2013 | TPF-5(081) Q3.pdf | Quarterly Progress Report | Public |
Quarterly Report: Period Ending Dec 2013 | 5(081) QPR Dec 2013.docx | Quarterly Progress Report | Public |
Quarterly Report: March 2014 | March_31_2014 SWZDI TPF-5(081) QPR.docx | Quarterly Progress Report | Public |
Quarterly Report: June 2014 | TPF(081)_June 2014.docx | Quarterly Progress Report | Public |
Quarterly Report: September 2014 | TPF5(081)_September2014.pdf | Quarterly Progress Report | Public |
Quarterly Report: December 2014 | TPF-5(081).pdf | Quarterly Progress Report | Public |
Quarterly Report: March 2015 | TPF-5(081)_March2015.pdf | Quarterly Progress Report | Public |
Work Plan - FY 2004 | FY2004_work_plan.pdf | Work Plan | Public |